Showing posts with label 60 miles. Show all posts
Showing posts with label 60 miles. Show all posts

Wednesday, April 23, 2014

Group Training Ride, Saturday, April 26 @ 8:30 am

Saturday Ride Location: Malta Park and Ride, Round Lake Rd. (just West of I-87 Exit 11) - Ballston Lake, 12019
Ride Start Time: 8:30 am 

Mileage: 60 miles
Notes: Please bring 2 water bottles, nutrition/food, cycling shoes, layers and proper gear for riding outdoors.
There will be a SAG Vehicle for this ride. You may put your SAG BAG with items in it in the SAG Vehicle.
Cancellations/Changes: Please check here, your email, and/or on the team Facebook page for all ride cancellations. We will try and inform you at least 1 hour prior to the ride start. 

You must sign up on the Google Doc so that we know who is attending.


Cue Sheet:

Tuesday, August 27, 2013

Group Training Ride, Saturday, August 31 and Saturday, September 7


Group Training Ride, Saturday, Aug. 31 with party to follow at Julie Gauer's
Ride Start Location: Melissa's House, 3 Battery Blvd., Mechanicville, NY 12118
Ride Start Time: 7:30 am for ALL 60 mile riders (you must be ready to ride at 7:30 am)  
Mileage: Approximately 60 miles.
Note: There also will be a shorter 25 ride led by Melissa (and will join with team) for their second half. The shorter route will be fairly flat with no category hill climbs. This ride will start around 10am once the full route riders come by.
ALL RIDERS: 
PLEASE MAKE SURE TO TEXT OR EMAIL MELISSA BY FRIDAY WHETHER OR NOT YOU ARE RIDING ON SATURDAY.  
Directions: 
From South: Take Northway I-87 to EXIT 9, toward US-9 /Halfmoon/Mechanicville/Stillwater. Follow RTE-146 E (crossing RTE. 9) for about 2.5 miles, turn LEFT onto RTE-146 (Toyota dealership in front of you). RTE-146 will turn into RTE 32 at light. Follow into Mechanicville, go through town all the way until the end. Price Chopper in front of you. Make LEFT onto RTE. 67. Go to first traffic light, make RIGHT onto Viall Ave. Bear LEFT going up hill staying on Viall Ave. Continue up hill around the bend, turn RIGHT onto BATTERY BLVD. #3 is the second house in on the LEFT.
From North: Take I-87 S to EXIT 11. Turn LEFT, go through roundabout onto Roundlake Bypass (2nd exit), Enter next roundabout and take the 2nd exit onto RTE-67. At first traffic light turn LEFT onto VIALL AVE. Bear LEFT going up hill staying on Viall Ave. Continue up hill around the bend, turn RIGHT onto BATTERY BLVD. #3 is the second house in on the LEFT.
Terrain: This course is very scenic filled with rolling hills, and a handful of good climbs.

Notes: 
1) You can park on my driveway if you wish, there's room for about 5 cars, maybe more. 
If you are parking on the street making sure not to block any mailboxesYou must give the mail carrier enough room to get to the mailboxes with her mail truck. 
Please try and park on the EVEN side of the street only. 
Also, make sure you are not parked on peoples lawns, try to stay on the road. 

2) Aaron will be driving the SAG vehicle for this ride
The SAG will be equipped with the usual; a first aid kit, water, and snacks. Feel free to bring your own snacks and beverages that need to be chilled to be put in the cooler (until full). You may put additional clothing in the SAG for later use or you can ditch layers as you progress through the ride if needed as well. NO LARGE BAGS/COOLERS WILL BE ALLOWED. There is only so much space available, so please only bring what you think you will need. We need extra space available if someone needs to be taken off the course.

3) Make sure you bring all bike gear needed...HELMETS, bike pump, saddle bags with tools and such to fix a flat, water bottles filled with electrolyte replacement, and nutritional needs. Layer up, remember, more is better, you will be able to ditch anything after the first loop if you need to.

4) Julie and Brian's Party Location: 5 Caraway Ct., Clifton Park 12065. Party starts at 2 pm and goes until they kick you out! 

Cue Sheet will be provided on Saturday before the start of the ride, or here later this week.
MapMyRide Links:
This will be changing slightly, as the route through the battlefield will be removed, and it will have the addition of the climb up George Thompson. 

_____________________________________________________________

Group Training Ride, Saturday, September 7
Ride Start Location: Saratoga State Park
Ride Start Time:  See MHCC ride info for start times.
Mileage: Metric Century for TNT fundraising participants. TNT is choosing Saturday to ride, but there is a Sunday ride option for anyone who would like to ride on Sunday instead.
ALL RIDERS: 
PLEASE MAKE SURE TO register through MHCC by Aug. 31 (online), or you will have to pay in person the day of which will have an additional fee.  
MHCC Ride information:
MHCC Registration Link:
Registration Online Closing Date:
SATURDAY, AUGUST 31, 2013 @ 11:59 PM

Wednesday, August 14, 2013

Group Training Ride, Saturday, August 17

Ride Start Location: Richard H. O'Rourke Middle School, 173 Lakehill Rd., Burnt Hills, NY 12027
Ride Start Time: 7:30 am for ALL riders (you must be ready to ride at 7:30 am)  

Mileage: 60 miles. 
Terrain: Peter says there are a few climbs...I guess you will find out what that means on Saturday! =) Enjoy!

Notes: 
1) There are 5 Possible Rest Stops along the way at miles 24 (Stewarts)32 (Galway Store), 38 (Stewarts), 44 (Stewarts) and at mile 50 (Stewarts). 

2) Please email Coach Peter if you plan on attending this ride at Peter.Miranda@momentive.com

3) Make sure you bring all bike gear needed...HELMETS, bike pump, saddle bags with tools and such to fix a flat, water bottles filled with electrolyte replacement, and all nutritional needs for a 60 mile ride. 

4) There will NOT be a SAG vehicle for this ride.

Cue Sheet: